Recorded from bare land: earthworks, foundations, walls, roof, through to the porch lights on.
- Site work
- Structure
- Finishing
- Completed
- Interior
No more wondering ‘what happens next?’. Every step from our first meeting to the warranty — how long it takes, which documents you need, and what usually causes delays, with how we avoid them.
The whole journey
Tap a step to jump to its details: how long it takes, the documents, and what we do to keep it moving.
1 Plan
2 Approve & finance
3 Build
4 Hand over & protect
The durations below are real ranges, not marketing promises. The two steps that most often delay a project are council approval and the financing documents — and both can be started earlier than people assume. Several steps run in parallel, so the total is shorter than the sum of the parts.
We listen to your needs, budget & vision, and clearly explain the process and package options.
RumahHQ consultant
We verify the land status, category, express conditions and suitability to build.
RumahHQ & land surveyor
We design floor plans and 3D visuals FREE, tailored to your taste.
RumahHQ design team
A complete A–Z quotation through to key handover — transparent with no hidden costs.
RumahHQ
Registered architect & engineer submit architectural and structural plans to the council.
Registered architect/engineer & RumahHQ
The council reviews & approves the building plans (required for loans or urban areas).
The council — we follow up on your behalf
Prepare & submit documents for LPPSA / KWSP / bank. We assist throughout.
Client + RumahHQ + LPPSA/bank
Site work proceeds on schedule: foundation, structure, roof, M&E and finishes.
RumahHQ project team & skilled tradesmen
A thorough inspection & defect list resolved before handover.
RumahHQ QA supervisor & client
The completed home is handed over after inspection; you receive the keys and documents.
RumahHQ
The architect/engineer (Principal Submitting Person) issues the Certificate of Completion and Compliance (CCC), certifying the home is built to approved plans and safe to occupy.
Registered architect/engineer (PSP) & RumahHQ
12-month structural warranty & defect repair service after handover.
RumahHQ
This list is generated from the steps above, so it cannot fall out of step with them. Not all of it applies to every project, but preparing the relevant items early cuts weeks off the total.
The three that delay people most often: a current quit rent receipt, the EPF statement, and the CCRIS report. All three you can obtain yourself in a day.
We photographed our Ijok project from bare land to handover — every step above, in pictures.
Selangor
Single-storey bungalow
Recorded from bare land: earthworks, foundations, walls, roof, through to the porch lights on.
Selangor
Single-storey bungalow
How reinforced wall panels are erected, sprayed and plastered, step by step.
Selangor
Single-storey bungalows
Mustard single-storey bungalows, from ground beams to a lit carport.
Consultation, drawings, 3D views and a quotation are all free. You do not need to commit to anything to begin.