How Much Will Your House Cost? Find Out in 30 Seconds.
No more guessing. Pick your floor area and package and you see the full total and every item behind it — at the real rates we publish, not a generic market estimate. No registration, no charge, and nobody will contact you unless you ask.
- Gold package rate
- RM210–250
- per square foot
- Rates effective
- 2026-09-20
- Drawings & quotation
- Free
Estimated construction cost
RM383,500 – RM482,500
Council plan approval is not yet confirmed, so the low end leaves it out and the high end includes it.
RM210–240 per square foot × 1,800 square feet
- Finish package Gold RM210–240 psf × 1,800 sq ft
- RM378,000 – RM432,000
- Council approval through to CCC Fixed cost
- RM0 – RM45,000
- Permanent electricity & water meters Fixed cost
- RM5,500
The rate varies with the design and specification of the house. This is an estimate only: our QS team prepares the formal quotation after going through the construction drawings.
Instalment from RM1,831/month LPPSA 4.00% fixed, 30 years, 100% margin. An estimate only.
Rates effective 2026-09-20 (version 2026.09c). An estimate, not a formal quotation. Land not included.
How this figure is built
There is no hidden formula. Construction cost is the rate per square foot times the built-up area, plus two fixed costs if you select them. That is all.
Rate per square foot
| Storeys | Package | Rate |
|---|---|---|
| 1 storey | gold | RM210–240 psf |
| 1 storey | silver | RM200–220 psf |
| 2 storey | gold | RM220–250 psf |
| 2 storey | silver | RM210–230 psf |
The rate varies with the design and specification of the house. This is an estimate only; our QS team prepares the formal quotation after going through the construction drawings.
Fixed costs
- Council approval through to CCC Architectural and engineering plans, council fees, permit management and CCC.
- RM45,000
- Permanent electricity & water meters Application, deposit and connection with TNB and the water authority.
- RM5,500
A worked example
A 2,000 sq ft single-storey house, Gold package, including council approval and meters:
RM210–240 × 2,000 + 45,000 + 5,500 = RM470,500 – RM530,500
The calculator accepts areas from 600 to 12,000 square feet. Outside that range we give no figure, because the cost per square foot for very small or very large projects no longer follows a flat rate.
Financing through our panel
Golden Sharp Innovation (IP0580950-X) is a registered panel contractor with the institutions above. Panel status means our credentials as a contractor have been assessed, and our progress-claim documents follow the format these institutions expect — it is not a guarantee that your financing will be approved, and not an endorsement of our services by them. Approval and terms are determined entirely by LPPSA or the bank concerned. Logos and trademarks are the property of their respective owners.
What to do next
The cost is half the picture. The other half is how much you can borrow — and the most expensive mistake in this process is choosing a design first, then finding your financing approval comes in below the build cost.
The order we recommend:
- Check your financing eligibility — LPPSA for the public sector, or a bank for the private sector.
- Check your land: title, express conditions, access and land category.
- Choose from our 62 plans, or ask for a free custom design.
- We visit the site and issue a formal quotation.