“I have RM300,000. What kind of house can I build?” It is the question we are asked most by families who already own land. The answer is not a picture of a house. It is a calculation you can do yourself, and the result is smaller than many people expect, so it is better to know now than after the plans are drawn.

One thing first: every figure here is the cost of building on land you already own. The price of the land is not included. The rates used are in force from 23 September 2026.

Want the figure for your own floor area? Our cost calculator shows the full formula, not just an answer. Free, no sign-up.

Step 1: subtract the fixed costs first

An RM300,000 budget is not all for walls and roof. Almost every project needs two fixed costs, and we publish both:

  • Council approval through to the CCC: RM45,000.
  • Permanent electricity and water meters: RM5,500.

Together that is RM50,500. What is left for the actual build is RM249,500.

An RM300,000 budget split three ways Horizontal bar: RM249,500 for the build, RM45,000 for council approval through to the CCC, and RM5,500 for permanent electricity and water meters. The fixed costs total RM50,500. An RM300,000 budget, split RM249,500 the build RM45k council RM5,500 electricity and water meters Fixed: RM45,000 + RM5,500 = RM50,500 Rates from 23 September 2026. Land not included.
Figure 1. Only RM249,500 of the RM300,000 becomes house; the rest is fixed approval and meter costs.

Step 2: divide by the psf rate

Our package rates are a range per square foot, because where your house falls in the range depends on its design and specification. So we work from both ends. The top of the range gives the safe floor area; the bottom gives the largest area if everything goes well.

For the whole journey from checking your land to handover, read how to build a house on your own land. The full rate breakdown and a worked 1,800 sq ft example are in the cost to build a house on your own land in 2026.

RM249,500 divided by the psf rate, rounded down:

Type Rate Buildable floor area
Single storey, Silver package RM200–220 psf 1,134 – 1,247 sq ft
Single storey, Gold package RM210–240 psf 1,039 – 1,188 sq ft
Two storey, Silver package RM210–230 psf 1,084 – 1,188 sq ft
Two storey, Gold package RM220–250 psf 998 – 1,134 sq ft

In short: with the full RM300,000 we estimate a house of roughly 1,000 to 1,130 square feet if the rate lands at the top of the range, and up to about 1,250 square feet only if it lands at the bottom. That is an estimate, not a guarantee; our QS team’s official quotation sets the real figure. That is a tidy 3-bedroom house, or a comfortable Mini Bungalow. It is not a 1,800 square foot 4-bedroom house.

Two things are worth noticing. First, Silver and Gold overlap because the structure and concrete grade are the same; the difference is in the finishes. Compare the packages here. Second, two storeys do not help at this budget: the smallest two-storey plan in our catalogue is 2,252 square feet, far above the limit above.

Step 3: pick a plan that fits

Each design’s price in our catalogue is worked out from its own drawings, so it does not equal floor area times the psf rate. To stay cautious we compare against the RM249,500 above. The result:

  • Based on the catalogue estimates, all 20 Mini Bungalows fit. They are priced RM84,250 – RM216,400, for 337 to 1,082 square feet, 1 or 2 bedrooms. See all Mini Bungalows.
  • Based on the catalogue estimates, one 3-bedroom bungalow fits: RHQ-E1-02, 1,070 square feet, RM238,409.
  • One more is close: RHQ-E1-01, 1,019 square feet, RM266,611, above RM249,500. Whether it fits depends on the official quotation.

The 4-bedroom plans in our catalogue start at RM372,535, so none fits this budget.

3D render of RHQ-E1-02, a single-storey bungalow with a car porch on the left, tall windows and dark panels at the front

RHQ-E1-02 is the cheapest 3-bedroom bungalow in our catalogue.

3D render of Mini Bungalow RHQ-E2-09, a gable-roofed house with red brick walls and a front veranda

RHQ-E2-09 is the most expensive Mini Bungalow in the catalogue, at 1,082 square feet and RM216,400: the top end of this type, and still under the RM249,500 left.

A house under RM300k: what it does not cover

A budget of exactly RM300,000 has no room for surprises. The costs below are not in the psf rate, and we have explained the hidden costs one by one:

  • unusual groundwork, fencing and landscaping
  • air-conditioning units, furniture and curtains
  • legal fees, stamp duty, valuation and insurance, if you are borrowing

The full list of exclusions is on the packages page.

Our advice in the cost article is to set aside 10% of the build cost as a buffer. On an RM300,000 budget already used up by the build and the fixed costs, that buffer does not exist. You have two honest options: raise the budget, or pick a house at the lower end of the table, not the top.

If the RM300,000 is your loan eligibility

If RM300,000 is the amount a bank or LPPSA allows, the same arithmetic applies: subtract the fixed costs first, then divide. Check your eligibility to learn the real figure and which rule is limiting you, before you fall for one design.

Checklist

  • Subtract the RM50,500 fixed costs from your budget
  • Divide the remainder by both ends of your chosen package’s psf rate
  • Plan with the smaller end
  • Filter the catalogue by that floor area, not by the prettiest picture
  • Keep money for groundwork, fencing and furniture outside the RM300,000

Next steps

Work out the cost for your own floor area, then browse all single-storey plans. Once you have one or two favourites, contact us. Our QS team’s official quotation is worked out from the construction drawings, free of charge. To see what happens next, read how council approval through to the CCC works.

All figures are construction cost estimates as at 23 September 2026 and are not an official quotation. Land price not included.