Renovation & Extensions: When the House Starts to Feel Small

More children, parents moving in, a kitchen that is no longer big enough. Renovation work is different from a new build — its cost depends on what is already on site — so we start with a free visit before giving any price.

We do not publish a per-square-foot rate for renovation, and that is a deliberate decision. For a new build on an empty site, a flat rate works because every project starts from the same point. For renovation, the cost is dominated by what is already standing: the type of foundation, whether that wall is load-bearing, where the pipes and wiring run, and how much room there is to work.

So the process is: a free site visit first, then a quotation based on what we see. There is no charge for the visit and no obligation afterwards.

The kinds of work we do

Extra ground-floor rooms

Needs council approval

The most common and the simplest. Involves new foundations, a roof extension and opening up existing walls. Needs plan approval if it changes the building footprint.

Adding an upper floor

Needs council approval & a structural check

Needs an engineer to check the existing foundations and structure. Not every single-storey house can carry a second floor without strengthening work.

Kitchen & dining area

Usually needs approval

Extending to the back of the house, usually with a light roof. Drainage and ventilation need attention.

An extra bathroom

Depends on scope

The plumbing and waterproofing are what count. A waterproofing failure is the most expensive renovation defect to fix later.

Full finish upgrade

Usually no approval

Tiles, kitchen, bathrooms, wiring and paint without changing the structure. No plan approval is needed if there is no structural or footprint change.

Structural repairs

Depends on the cause

Cracks, foundation movement, a roof that needs replacing. Needs a diagnosis before a price — the cause of the problem decides the cost, not its symptoms.

Three things you should know first

1. Unapproved extensions reduce value

An unapproved extension does not appear on the approved plans, so it can block a charge and complicate a sale. A careful buyer will notice, and a bank valuer certainly will. If you already have an unapproved extension, it can sometimes be regularised — ask us.

2. Not every single-storey house can take another floor

Foundations and columns are designed for the loads expected when the house was built. Adding a second floor adds a large load, and an engineer has to check whether the existing structure can carry it. Sometimes the answer is no, and sometimes yes with strengthening work. This is the first check, not the final surprise.

3. Waterproofing is the cost most worth paying

A waterproofing failure in an extra bathroom or roof is the most expensive renovation defect to fix later, because the repair means breaking finishes that have only just been completed. Do not compromise here to save a few hundred ringgit.

Frequently asked

Why don't you give a per-square-foot rate for renovation?
Because the cost is dominated by what is already on site, not by the area of new work. Opening a load-bearing wall, strengthening foundations that were not designed for a second floor, or working in a tight space can double the cost for the same area. A flat rate for renovation is a figure no honest contractor can stand behind.
Do I need council approval for a renovation?
If the work changes the building footprint or structure, or adds roofed area — yes. Upgrading interior finishes without structural change usually does not. The dangerous part is the grey area: many people build extensions without approval and later find it blocks a sale or a charge. See the council approval process.
What is LPPSA renovation financing?
LPPSA provides a financing facility for civil servants to renovate or repair a home, separate from financing to build or buy. The rates and limits differ from build financing. Our eligibility check works out build financing at 4.00%; for the renovation facility, contact us and we will check the current terms with you.
Can extensions be done while the house is lived in?
Yes for most work, but it is slower and costs more because the work has to be screened off and cleaned up every day. For a full finish upgrade or an upper-floor extension, moving out temporarily is usually cheaper, even after counting the rent.
How long does a renovation take?
A finish upgrade: 4 to 8 weeks. Extra ground-floor rooms: 2 to 4 months including approval. An upper-floor extension: 4 to 6 months. Council approval is the hardest part to estimate, just as with a new build.

Free site visit

Send photos of your house and the area you want to change on WhatsApp. We give you a first opinion for free, and schedule a visit if it is worth it.

WhatsApp Free Quotation