Recorded from bare land: earthworks, foundations, walls, roof, through to the porch lights on.
- Site work
- Structure
- Finishing
- Completed
- Interior
Bungalow · 1 storey · 4 bed · 4 bath · 2,220 sq ft
Estimated construction cost RM570,481 from RM2,724/month · LPPSA 4% See details
Gold and Silver differ in the finishes; the base structure is the same. The real rate for a design is set by the QS team from its drawings.
Plans, 3D and quotation free. No registration, no obligation.
Get the Full Plans & a Quotation on WhatsAppA wide, dark hip roof shelters a white and brown facade, with a large covered porch at the front. Four bedrooms with four bathrooms — a comfortable home for a family that often has guests staying over.
RHQ-A5-08 has 4 bathrooms for 4 bedrooms in 2,220 square feet — one of the most balanced ratios in the A5 series.
This design suits a medium-sized family with three or four children. On average each bedroom accounts for about 555 square feet of the total area, and a ratio of 4 bathrooms to 4 bedrooms lets almost every bedroom have its own bathroom. As a guide, a plot of about 4,800 square feet is needed for this single-storey design once the front, side and rear setbacks councils usually require are allowed for.
This cost is still within LPPSA's fixed 4% band (up to RM750,000), but it is above the likely eligibility of a civil servant on a moderate salary. Check your eligibility first so you know whether this amount fits.
RHQ-A5-08 is number 8 of 10 in series A5 by floor area, smallest first. The two nearest in size, compared with this design:
Find out in one minute — no registration, and your income figures are not stored.
Add a room, enlarge the kitchen, change the front — we adapt plan RHQ-A5-08 to the shape of your land and the way your family lives, with new 3D views and a new quotation. Free, with no obligation.
Ask to Adapt This PlanEstimated construction cost
RM570,481
RM257 per sq ft
Instalments from RM2,724/month
LPPSA fixed 4%, 30 years, 100% margin.
Plans, 3D and quotation free. No registration, no obligation.
How this figure was worked out
A detailed estimate, calculated from a full bill of quantities (BQ) for this design's drawings.
A quick estimate at today's Gold package rate for a 1-storey house (RM210–240 per sq ft) for this floor area is RM466,200 – RM532,800. The figure above is calculated separately, so the two can differ.
All figures are construction cost estimates as at 2026-09-23 and not a formal quotation. They exclude the land, unusual earthworks, fencing, landscaping and furniture. A formal quotation is provided free after a site visit.
Our real single-storey projects. Not necessarily design RHQ-A5-08, but the same team and the same standard of work.
Selangor
Single-storey bungalow
Recorded from bare land: earthworks, foundations, walls, roof, through to the porch lights on.
Selangor
Single-storey bungalow
How reinforced wall panels are erected, sprayed and plastered, step by step.
Selangor
Single-storey bungalows
Mustard single-storey bungalows, from ground beams to a lit carport.
The designs closest in floor area to RHQ-A5-08.
Bungalow · 1 storey · 4 bed · 3 bath
Estimate RM443,800
from RM2,119/month · LPPSA 4% over 30 years
Bungalow · 1 storey · 4 bed · 3 bath
Estimate RM593,793
from RM2,835/month · LPPSA 4% over 30 years
Bungalow · 2 storey · 5 bed · 4 bath
Estimate RM550,725
from RM2,629/month · LPPSA 4% over 30 years
Bungalow · 2 storey · 4 bed · 4 bath
Estimate RM592,766
from RM2,830/month · LPPSA 4% over 30 years
Plain guides to cost, financing, land and house plans. Know what to check, and what to ask, before you spend on your build.
Modern kampung house on family land: 30 single-storey bungalow plans, cost estimates by rate per sq ft, and what to check on agricultural or inherited land.
Read the article →
A guide to choosing a single-storey bungalow plan: land size, number of rooms, the three-zone layout, sun direction and budget, with a real floor plan example.
Read the article →
What does RM300,000 build on your own land? Buildable floor area by package, which catalogue plans fit, and the fixed costs to subtract first.
Read the article →